How to use this practice test

These 9 journeyman-exam practice questions cover NEC Chapter 4 · Articles 480–480 across 9 code concepts, every one with the correct answer and a plain-English explanation of the rule behind it. They come from the same question bank the Loomi app trains you on — this is the free web sample, not a separate watered-down set.

Work straight down the sheet and answer before you peek: each question hides its answer behind Show answer & explanation. Questions tagged Code lookup are speed drills — race your codebook to the cited section. Printing this page gives you a clean paper worksheet with the answers left off.

Battery room egress, piping restrictions, and illumination

NEC 480.10(E)

Dedicated battery rooms need outward-swinging panic-hardware doors, no gas piping, and lighting that isn't automatic-only or a hazard to people or batteries.

Q1 NEC 480.10(E) Code lookup

An installer is designing lighting for a working space around stationary standby batteries and wants to control the lighting outlet with an automatic occupancy sensor as the only means of control. Which section governs whether this is allowed?

  1. A 480.10(B)
  2. B 480.10(C)
  3. C 480.10(G)
  4. D 480.10(A)
Show answer & explanation

Correct: C — 480.10(G)

480.10(G) requires illumination for battery working spaces and states the lighting outlets shall not be controlled by automatic means only. 480.10(C) addresses working space dimensions and 480.10(B) addresses live parts, not lighting control.

Field marking and notification labels for battery disconnects

NEC 480.7(F)

The battery disconnect (or the battery itself, if there's no disconnect) needs a durable field label with voltage, fault current, an arc flash label, and a calculation date — except one- and two-family dwellings only need the voltage.

Q2 NEC 480.7(F)

A one-family dwelling has a stationary standby battery system with a disconnecting means. Which marking is still required on the label per 480.7(F)?

  1. A The date the calculation was performed
  2. B An arc flash label
  3. C Available fault current derived from the battery
  4. D Nominal battery voltage
Show answer & explanation

Correct: D — Nominal battery voltage

480.7(F) exempts one- and two-family dwellings from the fault current, arc flash label, and calculation date items, but nominal battery voltage is still required on every installation.

DC disconnecting means for stationary battery systems

NEC 480.7(A)

Any stationary standby battery over 60 volts dc needs a disconnect within sight; over 240 volts dc, the strings must also be segmentable for safe service.

Q3 NEC 480.7(A)

A stationary standby battery system operates at 48 volts dc. Per 480.7(A), what disconnect requirement applies?

  1. A No disconnecting means is required under 480.7(A) because the system is at or below 60 volts dc
  2. B A series-segmenting disconnect every 240 volts is required
  3. C A remote-only disconnect without sight requirement is required
  4. D A disconnecting means within sight of the battery is required
Show answer & explanation

Correct: A — No disconnecting means is required under 480.7(A) because the system is at or below 60 volts dc

480.7(A) only requires a disconnecting means for ungrounded conductors from a stationary standby battery with a voltage over 60 volts dc. At 48 volts dc, the system is below that threshold, so this rule doesn't mandate a disconnect. The sight-visible disconnect and the 240-volt segmenting rule both apply only once the relevant voltage thresholds are exceeded.

Flexible cable interconnections within battery enclosures

NEC 480.12

Inside a battery enclosure, flexible cables 2/0 AWG and larger can wire batteries to cells and out to a junction box, but only if listed for the environment and terminated per 110.14.

Q4 NEC 480.12

Under 480.12, what is the smallest permitted size for flexible cables used within a battery enclosure?

  1. A 4/0 AWG
  2. B 1/0 AWG
  3. C 4 AWG
  4. D 2/0 AWG
Show answer & explanation

Correct: D — 2/0 AWG

480.12 sets the minimum size for flexible cables in a battery enclosure at 2/0 AWG and larger. The smaller 4 AWG and 1/0 AWG sizes fall below this threshold, and 4/0 AWG is larger than the minimum, not the minimum itself.

Battery and cell termination requirements

NEC 480.4

Battery terminations must resist corrosion, carry load without overheating, avoid mechanical strain on terminals, and stay accessible for inspection.

Q5 NEC 480.4

A field technician is connecting dissimilar metal terminals on a stationary battery bank. What does 480.4(A) require?

  1. A Double insulation rated for the higher of the two metals' temperature limits
  2. B A dedicated disconnecting means at each dissimilar-metal joint
  3. C Antioxidant material suitable for the connection, where the battery manufacturer's instructions recommend it
  4. D Stainless steel hardware in place of antioxidant compound
Show answer & explanation

Correct: C — Antioxidant material suitable for the connection, where the battery manufacturer's instructions recommend it

480.4(A) requires antioxidant material suitable for the battery connection when mating dissimilar metals, where recommended by the battery manufacturer's installation and instruction manual. There's no requirement for a dedicated disconnect at the joint, substituting hardware material, or double insulation — those aren't part of 480.4(A).

Working space clearances around stationary batteries

NEC 480.10(C)

Battery working space follows the same 110.26/110.34 rules as other electrical equipment, plus a 1 in. side clearance on non-access sides and manufacturer-specified top clearance for tiered or shelved cells.

Q6 NEC 480.10(C)

Per 480.10(C), from where is working space for stationary standby batteries measured?

  1. A From the nearest disconnecting means
  2. B From the centerline of the battery room
  3. C From the edge of the battery cabinet, racks, or trays
  4. D From the outer surface of the individual cell container
Show answer & explanation

Correct: C — From the edge of the battery cabinet, racks, or trays

480.10(C) specifies working space is measured from the edge of the battery cabinet, racks, or trays, not from the individual cell container or other reference points. This matters because rack and tray hardware often extends beyond the cells themselves.

Emergency disconnect labeling for one- and two-family dwellings

NEC 480.7(B)

A stationary standby battery at a one- or two-family dwelling needs an outdoor, readily accessible disconnect labeled EMERGENCY DISCONNECT.

Q7 NEC 480.7(B) Code lookup

A new one-family dwelling has a stationary standby battery system installed to back up the electrical service. The AHJ wants to confirm the disconnecting means for the battery is placed and marked correctly for first responders. Which section specifically requires this disconnect to be located outside at a readily accessible location and labeled "EMERGENCY DISCONNECT"?

  1. A 480.7(G)(1)
  2. B 480.7(B)
  3. C 480.7(F)
  4. D 480.7(A)
Show answer & explanation

Correct: B — 480.7(B)

480.7(B) is the specific one- and two-family dwelling rule requiring the standby battery disconnect (or its remote control) to be outside, readily accessible, and labeled EMERGENCY DISCONNECT. 480.7(A) only covers general disconnecting means requirements without the dwelling-specific labeling text, and 480.7(G)(1) instead addresses identifying power sources at facilities with utility service plus batteries, not the disconnect label itself.

Battery location: ventilation and live-part guarding

NEC 480.10(A)

Battery locations need enough ventilation to prevent explosive gas buildup, and any exposed live parts must be guarded per 110.27.

Q8 NEC 480.10(A) Code lookup

A stationary standby battery installation uses a lead-acid chemistry that off-gases during charging. The design team needs to confirm what the NEC requires to keep gas from accumulating to an explosive mixture in the battery room. Which section governs this requirement?

  1. A 480.11(A)
  2. B 480.10(G)
  3. C 480.10(A)
  4. D 480.10(C)
Show answer & explanation

Correct: C — 480.10(A)

480.10(A) is the specific rule requiring ventilation/diffusion sufficient to prevent accumulation of an explosive gas mixture from the battery. 480.10(C) instead addresses spacing/working space about stationary standby batteries, and 480.11(A) covers vents on vented cells themselves, not room ventilation; 480.10(G) is about illumination.

Identifying facilities powered by stationary standby batteries

NEC 480.7(G)

A facility with stationary standby batteries needs a plaque or directory — 705.10 if it's also tied to a utility service, 710.10 if it's stand-alone.

Q9 NEC 480.7(G)

A commercial building has a normal utility service and a stationary standby battery system used for backup power. Per 480.7(G)(1), how must the power sources be identified?

  1. A With a plaque or directory installed in accordance with 710.10
  2. B With a plaque or directory installed in accordance with 705.10
  3. C No identification is required because the battery is not utility-interactive
  4. D With warning labels on every battery cell rather than a single plaque
Show answer & explanation

Correct: B — With a plaque or directory installed in accordance with 705.10

480.7(G)(1) requires plaques or directories per 705.10 for facilities that have both utility service and stationary standby batteries. The 710.10 option applies to stand-alone systems under 480.7(G)(2), not this case.