Free NEC practice test · Article 800

Communications Systems practice questions

A free NEC Article 800 practice test for the journeyman exam: 27 questions on General Requirements for Communications Systems, each with the answer and the why behind it.

27 questions · free · answers included NEC 2023 · Updated

How to use this practice test

These 27 journeyman-exam practice questions cover NEC Article 800 across 27 code concepts, every one with the correct answer and a plain-English explanation of the rule behind it. They come from the same question bank the Loomi app trains you on — this is the free web sample, not a separate watered-down set.

Work straight down the sheet and answer before you peek: each question hides its answer behind Show answer & explanation. Questions tagged Code lookup are speed drills — race your codebook to the cited section. Printing this page gives you a clean paper worksheet with the answers left off.

Where to connect the bonding conductor: IBT, grounding means, or none

NEC 800.100(B)

Always land the communications bonding conductor on an intersystem bonding termination if one exists; only drop down the priority list in 800.100(B)(2) or use a made electrode under 800.100(B)(3) when there's no IBT.

Q1 NEC 800.100(B)

A building has a properly installed intersystem bonding termination per 250.94. Where must the communications bonding conductor be connected?

  1. A To the intersystem bonding termination
  2. B To the nearest point on the grounding electrode system per 250.50
  3. C To a dedicated driven ground rod at least 1.5 m (5 ft) long
  4. D To the nonflexible metal power service raceway
Show answer & explanation

Correct: A — To the intersystem bonding termination

Per 800.100(B)(1), if the building has an intersystem bonding termination, the bonding conductor shall be connected to it — the other options are fallback points used only under 800.100(B)(2) or (B)(3) when no IBT exists.

Permitted raceway types & fill limits for comm wiring

NEC 800.110(A)

Communications cables can go in any Chapter 3 raceway, a listed communications raceway, or as innerduct — but medium-power network-powered broadband cables are barred from communications raceways and follow standard Chapter 3/9 fill rules.

Q2 NEC 800.110(A)

A designer wants to run medium-power network-powered broadband communications cable through a listed general-purpose communications raceway. Is this permitted?

  1. A Yes, general-purpose communications raceways accept any type of communications cable
  2. B No, network-powered broadband cables cannot be installed in any raceway type
  3. C No, 800.110(A)(2) excludes medium-power network-powered broadband cables from communications raceways
  4. D Yes, as long as the raceway is listed in accordance with 800.182
Show answer & explanation

Correct: C — No, 800.110(A)(2) excludes medium-power network-powered broadband cables from communications raceways

800.110(A)(2) states medium-power network-powered broadband communications cables shall not be installed in raceways complying with that section (communications raceways). Listing under 800.182 is a real requirement for communications raceways generally, but it doesn't override this specific exclusion. The cables aren't banned from all raceways — they're simply routed through Chapter 3 raceways instead, per 800.110(A)(1).

Sharing raceways/boxes with other circuit types

NEC 800.133(A)

Communications cable can share space with low-voltage and comm-type circuits, but not with power or Class 1 conductors unless a barrier separates them.

Q3 NEC 800.133(A)

Under 800.133(A)(1), communications cables are permitted in the same raceway as which of the following?

  1. A Electric light and power conductors without a barrier
  2. B Non-power-limited fire alarm circuits
  3. C Power-limited fire alarm circuits under Article 760
  4. D Class 1 remote-control circuits
Show answer & explanation

Correct: C — Power-limited fire alarm circuits under Article 760

800.133(A)(1) lists power-limited fire alarm systems (Article 760 Parts I and III) as permitted to share space with communications cables. Class 1 circuits are excluded under 800.133(A)(2), and electric light/power or non-power-limited fire alarm conductors require a barrier under 800.133(A)(3).

How Chapter 8 applies other NEC chapters

NEC 800.3

Chapter 8 is self-contained — a rule from Chapters 1 through 7 applies to a communications installation only if 800.3(A) through (H) specifically calls it in.

Q4 NEC 800.3

A contractor is installing communications wiring under Chapter 8 and wants to know whether the general requirements in Chapters 1 through 7 automatically apply. What does 800.3 require?

  1. A Chapters 1 through 7 never apply to any Chapter 8 installation
  2. B Only the sections of Chapters 1 through 7 specifically referenced within Chapter 8 apply
  3. C Chapters 1 through 7 apply only to Class 2 and Class 3 circuits, never to other communications circuits
  4. D All of Chapters 1 through 7 apply unless Chapter 8 states an exception
Show answer & explanation

Correct: B — Only the sections of Chapters 1 through 7 specifically referenced within Chapter 8 apply

800.3 flips the usual pattern — Chapter 8 is largely self-contained, so a Chapter 1-7 rule applies only where Chapter 8 specifically calls it out. A blanket 'all apply' reading, a blanket 'none apply' reading, and a Class 2/3-only reading are all incorrect under 800.3.

Cables in one- & two-family dwellings (non-riser)

NEC 800.113(L)

In a one- or two-family dwelling's general spaces, plenum, riser, and general-purpose communications cables are fine — bare Type BMU/BLU cable and unlisted communications wire are not.

Q5 NEC 800.113(L) Code lookup

A contractor is running general-purpose communications cable through a one- and two-family dwelling, in areas that are not ducts/plenums for environmental air, not risers, not fireproof shafts, and not cable trays. Which section lists the cable, wire, and raceway types permitted in this scenario?

  1. A 800.113(G)(1)
  2. B 800.113(H)(1)
  3. C 800.113(C)(1)
  4. D 800.113(L)(1)
Show answer & explanation

Correct: D — 800.113(L)(1)

800.113(L)(1) covers uses permitted for communications wires, cables, cable routing assemblies, and communications raceways in one- and two-family dwellings outside the specific locations in (B) through (F). 800.113(G)(1) instead governs permitted uses for vertical riser runs specifically in one- and two-family dwellings, not general dwelling locations.

Bonding/grounding electrode conductor: length, routing, protection

NEC 800.100(A)(4)

The communications bonding conductor must be as short and straight as practicable — under 20 ft in one- and two-family dwellings unless a supplemental ground rod is added — and protected wherever it's exposed to damage.

Q6 NEC 800.100(A)(4)

In a one-family dwelling, the communications bonding conductor cannot be kept under 6.0 m (20 ft) due to the building layout. What does 800.100(A)(4) require?

  1. A Drive a separate ground rod, bond the conductor to it, and connect the rod to the power grounding electrode system
  2. B Upsize the conductor to compensate for the added length
  3. C Route the conductor through a metal raceway instead to reduce effective length
  4. D Install the conductor at whatever length is needed; the 20 ft limit is only a recommendation
Show answer & explanation

Correct: A — Drive a separate ground rod, bond the conductor to it, and connect the rod to the power grounding electrode system

800.100(A)(4) requires that when the overall length can't practicably be held to 6.0 m (20 ft) in a one- or two-family dwelling, a separate ground rod meeting the dimensional criteria of 800.100(B)(3)(2) or (B)(3)(3) be driven, with the bonding conductor connected to it and the rod then bonded to the power grounding electrode system. Upsizing the conductor or using a metal raceway doesn't address the length requirement — a raceway is a physical-protection measure under 800.100(A)(6), not a length workaround, and the 20 ft figure is a hard limit, not a suggestion.

Cable types permitted in cable trays

NEC 800.113(H)

Cable trays can carry plenum, riser, and general-purpose communications cables and raceways, but never limited-use cables, bare communications wires, or hybrid power/communications cables.

Q7 NEC 800.113(H)

Which of the following is permitted to be supported by a cable tray under 800.113(H)(1)?

  1. A A limited-use communications cable
  2. B A hybrid power-and-communications cable
  3. C A general-purpose communications cable
  4. D A Type CMUC cable
Show answer & explanation

Correct: C — A general-purpose communications cable

800.113(H)(1) permits plenum, riser, and general-purpose communications cables in cable trays. Limited-use cables, Type CMUC cables, and hybrid power-and-communications cables are all listed as not permitted under 800.113(H)(2).

Cable routing assembly support intervals

NEC 800.110(C)

Support cable routing assemblies every 3 ft horizontal and 4 ft vertical, unless the listing says otherwise, and never exceed 10 ft horizontal.

Q8 NEC 800.110(C)

A cable routing assembly is listed for a horizontal support interval of 12 ft. What is the maximum interval actually permitted?

  1. A 10 ft, because it can never exceed the 3 m absolute maximum
  2. B 3 ft, listings cannot extend the base interval
  3. C 4 ft, the vertical default applies instead
  4. D 12 ft, per the listing
Show answer & explanation

Correct: A — 10 ft, because it can never exceed the 3 m absolute maximum

800.110(C)(1) allows a listing to extend support spacing beyond the 900 mm (3 ft) default, but 'in no case shall the distance between supports exceed 3 m (10 ft)' — that cap overrides even a listing that specifies more. So a 12 ft listed interval is not permitted; 10 ft is the hard ceiling.

Cables at distributing frames & cross-connect arrays

NEC 800.113(I)

Distributing frames and cross-connect arrays only take plenum, riser, and general-purpose communications cables — limited-use, hybrid power/comm, and BMR-family cables are barred.

Q9 NEC 800.113(I)

An installer is terminating communications cables at a cross-connect array. Which of the following is permitted under 800.113(I)(1)?

  1. A A hybrid power-and-communications cable
  2. B A Type BLU cable
  3. C A limited-use cable
  4. D A riser-rated communications cable
Show answer & explanation

Correct: D — A riser-rated communications cable

800.113(I)(1) permits plenum, riser, and general-purpose communications wires and cables at distributing frames and cross-connect arrays. Type BLU cable, limited-use cable, and hybrid power-and-communications cable are all specifically excluded by 800.113(I)(2).

Cables in fabricated environmental air ducts

NEC 800.113(B)

Only short plenum cable runs or raceway-protected cable are allowed inside a fabricated environmental air duct — bare cable runs of any real length are not.

Q10 NEC 800.113(B)

An installer wants to run communications cable directly inside a duct specifically fabricated for environmental air, without enclosing it in raceway. Under what condition is this permitted?

  1. A Any listed communications cable is allowed if it is limited-use type
  2. B The cable is plenum-rated and no more than 1.22 m (4 ft) long, associated with the air distribution system
  3. C The cable is general-purpose and installed in a metal sleeve
  4. D The cable is riser-rated and no more than 1.22 m (4 ft) long
Show answer & explanation

Correct: B — The cable is plenum-rated and no more than 1.22 m (4 ft) long, associated with the air distribution system

800.113(B)(1) permits only plenum cable up to 1.22 m (4 ft) directly in the duct, provided it's associated with the air distribution system. Riser-rated cable of the same length is not the permitted category, and general-purpose cable is only allowed inside a 300.22(B) raceway, not a sleeve — a distinction from the actual rule text.

Electrode connection method and bonding electrodes together

NEC 800.100(C)

Communications grounding electrode connections must use 250.70 methods, and a 6 AWG copper (or equivalent) bonding jumper must tie a separate communications electrode to the power system's electrode.

Q11 NEC 800.100(C)

A communications system at a one-family dwelling uses a separate grounding electrode instead of connecting to the power system's electrode. What does 800.100(D) require?

  1. A The communications electrode must be abandoned and the power electrode reused instead
  2. B No additional bonding is required if each electrode is independently grounded
  3. C A bonding jumper not smaller than 6 AWG copper or equivalent between the two electrodes
  4. D A bonding jumper not smaller than 4 AWG copper, matching the largest power service conductor
Show answer & explanation

Correct: C — A bonding jumper not smaller than 6 AWG copper or equivalent between the two electrodes

Per 800.100(D), when a separate electrode is used for communications, a bonding jumper not smaller than 6 AWG copper or equivalent must connect it to the power grounding electrode system. Independently grounded electrodes are not permitted to stand alone — that's exactly the potential-difference hazard this rule prevents. The 4 AWG sizing tied to service conductors is not how this jumper is sized.

Primary protector grounding and bonding at mobile homes

NEC 800.106

When a mobile home has no service equipment or grounded feeder disconnect within 30 ft, communications grounding falls back to a dedicated grounding electrode, bonded to the home's metal frame with at least 12 AWG copper.

Q12 NEC 800.106

A mobile home has no service equipment located within 9.0 m (30 ft) of its exterior wall. Per 800.106(A)(1), what must the primary protector grounding terminal connect to?

  1. A Nothing — grounding is not required if service equipment is absent
  2. B A grounding electrode installed in accordance with 800.100(B)(3)
  3. C The mobile home's neutral bus only
  4. D The nearest metallic water pipe, regardless of distance
Show answer & explanation

Correct: B — A grounding electrode installed in accordance with 800.100(B)(3)

Per 800.106(A)(1), when no mobile home service equipment is within 30 ft, the primary protector grounding terminal (along with the other listed components, if present) must connect to a grounding electrode per 800.100(B)(3). Tying to a water pipe or the neutral bus skips the specified electrode requirement, and grounding is never optional under this section.

Cables in multifamily dwellings

NEC 800.113(K)

In multifamily dwelling spaces outside the special locations of 800.113(B)-(G), plenum/riser/general-purpose cables and raceways are permitted, but bare BMU/BLU cables, unlisted communications wires, and hybrid power-communications cables are not.

Q13 NEC 800.113(K)

In a multifamily dwelling, outside the special locations already addressed elsewhere in 800.113, which cable is NOT permitted to be installed under 800.113(K)?

  1. A A hybrid power and communications cable
  2. B A general-purpose communications cable
  3. C A riser cable installed in a riser communications raceway
  4. D A limited-use cable less than 6 mm (0.25 in.) in diameter in a nonconcealed space
Show answer & explanation

Correct: A — A hybrid power and communications cable

Per 800.113(K)(2), hybrid power and communications cables are not permitted in multifamily dwellings outside the 800.113(B)-(G) locations. General-purpose cables, riser cables in riser raceways, and small-diameter limited-use cable in nonconcealed spaces are all listed as permitted under 800.113(K)(1).

Cables in other building locations (catch-all)

NEC 800.113(J)

Anywhere in a building not covered by 800.113(B) through (I), only plenum, riser, general-purpose, and limited-use communications cables and their raceways are allowed — bare BMU/BLU cable, communications wires alone, and hybrid power-and-communications cable are not.

Q14 NEC 800.113(J)

A limited-use communications cable is run exposed in a nonconcealed space in a building location covered by 800.113(J). What is the maximum exposed length permitted?

  1. A 15 m (50 ft)
  2. B 3 m (10 ft)
  3. C 1.5 m (5 ft)
  4. D No limit, as long as it is plenum rated
Show answer & explanation

Correct: B — 3 m (10 ft)

800.113(J)(1)(2) permits limited-use cables in these catch-all locations only up to a maximum of 3 m (10 ft) of exposed length in nonconcealed spaces. Longer runs, or claiming no limit, misstate the specific cap; 1.5 m understates it.

Overhead communications cable clearance above roofs

NEC 800.44(B)

Communications and CATV cables need 8 ft of vertical clearance above roofs, dropping to 3 ft on steep-slope roofs or 18 in. over a short overhang.

Q15 NEC 800.44(B) Code lookup

An installer is running a CATV coaxial service drop across a dwelling's main roof, with about 6 ft (1.8 m) of cable passing over the roof surface before it terminates at a through-roof raceway. The roof has a slope of 3 in 12. Which section sets the minimum vertical clearance required above the roof for this run?

  1. A 800.44(A)(4)
  2. B 800.44(D)
  3. C 800.44(B)
  4. D 800.44(C)
Show answer & explanation

Correct: C — 800.44(B)

800.44(B) governs clearance of communications and CATV cables above roofs, including the reduced-clearance exceptions for limited overhang runs and sloped roofs. 800.44(A)(4) covers clearance for wires on poles, in-span, or between buildings/masts generally, not the roof-specific reductions; 800.44(C) and 800.44(D) address masts and between-building runs, not roof crossings.

Overhead communications wires sharing poles/spans with power conductors

NEC 800.44(A)

On shared poles or spans, comm cables go below power conductors, off the power cross-arm, with proper climbing space and at least 12 in. separation (300 mm) plus 1 m (40 in.) at the pole.

Q16 NEC 800.44(A) Code lookup

A new house service is being run and the telephone company's aerial drop cable will share the same pole as the electric utility's overhead service conductors. Which section covers the general requirements that apply when communications wires/cables share a pole or run in-span parallel with electric light or power conductors?

  1. A 800.47(A)
  2. B 800.44(D)
  3. C 800.44(A)
  4. D 800.44(B)
Show answer & explanation

Correct: C — 800.44(A)

800.44(A) sets the four conditions — relative location, cross-arm attachment, climbing space, and clearance — that govern communications wires sharing a pole or running parallel in-span with power conductors. 800.44(B) only addresses cables passing above a roof and 800.47(A) covers underground entries, so neither applies to this pole/span scenario.

Cables in plenum spaces (other environmental air)

NEC 800.113(C)

In an environmental air plenum, use plenum-rated cable and raceway — or protect lower-rated cable inside a compliant raceway or solid-bottom metal tray with solid metal covers.

Q17 NEC 800.113(C)

A contractor wants to run general-purpose (CMG) communications cable exposed — not in a raceway or tray — through an air-handling plenum. Which statement is correct?

  1. A It's permitted because general-purpose cable meets the flame-spread rating required for plenums
  2. B It's permitted only if the exposed run is under 10 feet
  3. C It's not permitted; exposed general-purpose cable is specifically excluded under 800.113(C)(2)
  4. D No communications cable of any type may be installed in a plenum
Show answer & explanation

Correct: C — It's not permitted; exposed general-purpose cable is specifically excluded under 800.113(C)(2)

800.113(C)(2) specifically excludes exposed general-purpose cable from plenum spaces. There's no 10-foot exposed-run exception, and general-purpose cable doesn't carry a plenum rating. The last option is too broad — plenum-rated cable is expressly permitted under 800.113(C)(1).

Riser cables in one- & two-family dwellings

NEC 800.113(G)

One- and two-family dwelling risers get a relaxed cable list — plenum, riser, and general-purpose ratings all work, but bare communications wires and unlisted CMUC/BMU/BLU cables never do.

Q18 NEC 800.113(G)

An electrician is running communications cable through a shaft connecting floors in a two-family dwelling. Which cable is permitted under 800.113(G)(1)?

  1. A A Type BMU cable
  2. B A hybrid power and communications cable
  3. C A general-purpose rated communications cable
  4. D Bare communications wire run alongside the cables
Show answer & explanation

Correct: C — A general-purpose rated communications cable

800.113(G)(1) permits plenum, riser, and general-purpose cables in one- and two-family dwelling risers. Type BMU cable, hybrid power-and-communications cable, and bare communications wires are all listed as not permitted under 800.113(G)(2).

Cables in metal raceways within firestopped risers

NEC 800.113(E)

When a metal raceway in a firestopped riser encloses communications cable, only riser/plenum/general-purpose/limited-use cable or innerduct qualifies — cable routing assemblies, CMUC, BMR-family cables, bare communications wires, and hybrid power/communications cables do not.

Q19 NEC 800.113(E)

A metal raceway runs inside a riser shaft that has firestops at each floor. Which of the following is permitted inside that raceway per 800.113(E)(1)?

  1. A A hybrid power-and-communications cable
  2. B Type CMUC cable
  3. C Riser communications raceway (innerduct) containing riser-rated cable
  4. D A general-purpose cable routing assembly
Show answer & explanation

Correct: C — Riser communications raceway (innerduct) containing riser-rated cable

800.113(E)(1) permits riser communications raceway (innerduct) with riser-rated cable installed inside it. Cable routing assemblies, CMUC cable, and hybrid power-and-communications cables are all listed as not permitted under 800.113(E)(2).

Cables in vertical riser runs

NEC 800.113(D)

Only plenum- and riser-rated cables, raceways, and cable routing assemblies can run vertically through floors or a shaft — general-purpose and limited-use types are barred.

Q20 NEC 800.113(D) Code lookup

A telecom contractor needs to route CMR riser cable through a shaft that penetrates four floors of an office building. Which section lists what is permitted to be installed in that vertical riser run?

  1. A 800.113(F)(1)
  2. B 800.113(D)(1)
  3. C 800.113(H)(1)
  4. D 800.113(C)(1)
Show answer & explanation

Correct: B — 800.113(D)(1)

800.113(D)(1) is the Uses Permitted list specifically for cables, cable routing assemblies, and communications raceways installed in vertical riser runs penetrating floors or shafts. 800.113(C)(1) governs plenum spaces (environmental air handling), not vertical risers, and 800.113(F)(1) applies only when the riser is inside a fireproof shaft, a distinct condition from a general shaft/floor penetration.

Separation from power conductors

NEC 800.133(B)

Communications and CATV cables need at least 2 in. of separation from power and Class 1 conductors, unless one side is in a raceway or a solid nonconductor keeps them apart.

Q21 NEC 800.133(B)

Under 800.133(B), what is the minimum separation required between CATV-type coaxial cable and open power conductors when no raceway or barrier is used?

  1. A 300 mm (12 in.)
  2. B 50 mm (2 in.)
  3. C 25 mm (1 in.)
  4. D 150 mm (6 in.)
Show answer & explanation

Correct: B — 50 mm (2 in.)

800.133(B) sets the default separation at 50 mm (2 in.) between communications/CATV cables and electric light, power, Class 1, non-power-limited fire alarm, or medium-power network-powered broadband conductors. The larger distances are not the figure this section specifies, and 25 mm is too small to satisfy the rule.

Unlisted outside-plant cable length limit at building entrance

NEC 800.48

Unlisted outside plant communications and CATV coax cable can run only 15 m (50 ft) into a building from its point of entrance, and must terminate in an enclosure, on a primary protector, or at a grounding block.

Q22 NEC 800.48

An unlisted outside plant communications cable enters a dwelling and is routed through a plenum used for environmental air before terminating in an enclosure 12 m (40 ft) from its point of entrance. Is this installation compliant with 800.48?

  1. A No, because unlisted outside plant cable cannot be installed in an environmental air plenum regardless of length
  2. B Yes, because 12 m is under the 15 m limit
  3. C Yes, because terminating in an enclosure satisfies all requirements
  4. D No, because the cable must terminate at a grounding block instead of an enclosure
Show answer & explanation

Correct: A — No, because unlisted outside plant cable cannot be installed in an environmental air plenum regardless of length

800.48 permits unlisted outside plant cable only in building spaces other than risers, ducts for environmental air, plenums for environmental air, and other environmental air spaces — the plenum routing fails this condition regardless of the 15 m (50 ft) length being satisfied. The enclosure termination is correct for non-coax communications cable, but the space restriction is the violation here.

Mechanical execution of communications work

NEC 800.24

Communications cables must be supported neat and workmanlike so building use can't damage them, and CI cable adds a strict 24-inch, steel-only support rule.

Q23 NEC 800.24

An installer is running CI (Circuit Integrity) cable exposed across a ceiling. Per 800.24(B), what is the maximum allowed distance between supports?

  1. A 1.2 m (4 ft), matching general cable tray spacing
  2. B 610 mm (24 in.)
  3. C 1.4 m (54 in.)
  4. D No maximum, provided the cable is secured in a neat and workmanlike manner
Show answer & explanation

Correct: B — 610 mm (24 in.)

800.24(B) sets a specific 610 mm (24 in.) maximum support spacing for CI cable. The general 'neat and workmanlike' language in 800.24(A) applies to ordinary communications cable, but CI cable has its own stricter, distinct requirement rather than relying on general support practice.

Circuit integrity (CI) cables and fire-resistive circuit protective systems

NEC 800.179(E)

CI cable must be installed free-air only unless it's specifically listed and marked as part of a fire-resistive cable or protective system — installation always follows the listing, not your judgment.

Q24 NEC 800.179(E)

An installer wants to run CI-marked cable inside a metal raceway. Under what condition is this permitted?

  1. A Never — CI cable must always be installed in free air
  2. B Only if the cable is specifically listed and marked as part of a fire-resistive cable system
  3. C Only if the raceway is metallic and grounded
  4. D Only if the run is shorter than 2 hours' worth of fire exposure
Show answer & explanation

Correct: B — Only if the cable is specifically listed and marked as part of a fire-resistive cable system

Per 800.179(E)(1), CI cable installed alone keeps its listed fire rating only in free air per 800.24. It's permitted in a raceway only where it's specifically listed and marked as part of a fire-resistive cable system, as covered in 800.179(E)(2). Raceway material and run length aren't the qualifying factors.

General-purpose and limited-use cable types (CM/CATV/BM/BL, CMX/CATVX/BLX)

NEC 800.179(C)

General-purpose cables (CM, CATV, BM, BL, CMG) go anywhere except risers and plenums and must pass a cable-tray flame test; limited-use cables (CMX, CATVX, BLX) are restricted to dwellings and raceway and pass a lighter individual-cable flame test.

Q25 NEC 800.179(C)

A contractor wants to install Type CM cable in a plenum used for environmental air. Is this permitted?

  1. A Yes, as long as the cable passes the UL 1685 tray test
  2. B No — CM is listed for general-purpose use only, not risers or plenums
  3. C Yes, as long as the char length stays under 4 ft 11 in.
  4. D Yes, if the cable is also listed as CMX
Show answer & explanation

Correct: B — No — CM is listed for general-purpose use only, not risers or plenums

800.179(C) explicitly excludes risers and plenums from the general-purpose listing for CM cable — passing the flame-spread tray test doesn't expand where it can go. CMX is a limited-use type restricted to dwellings and raceway (800.179(D)), which is more restrictive, not less.

Limited-power (LP) cables and undercarpet wire/cable listing

NEC 800.179(F)

LP cables carry a marked amperage limit per conductor, undercarpet cable (CMUC) must resist flame spread under carpet, and general communications wire must resist spreading fire.

Q26 NEC 800.179(F)

A cable is marked "CMR-LP (1.0A)(60°C) 23 AWG 4 pair." What does the "1.0A" portion specify?

  1. A The inrush current rating for connected power-over-ethernet equipment
  2. B The maximum current per conductor the cable is listed to carry without exceeding its temperature rating
  3. C The minimum overcurrent protection device size required for the circuit
  4. D The total current the entire 4-pair bundle may carry combined
Show answer & explanation

Correct: B — The maximum current per conductor the cable is listed to carry without exceeding its temperature rating

Per 800.179(F), the "-LP(XXA)" suffix designates the current limit in amperes per conductor, ensuring the cable's temperature rating isn't exceeded in bundles, raceways, cable trays, or cable routing assemblies. It is not a whole-bundle total, an overcurrent device size, or an inrush figure.

Plenum and riser cable types (CMP/CATVP/BLP, CMR/CATVR/BMR/BLR)

NEC 800.179(A)

Plenum cables (CMP, CATVP, BLP) must resist flame and low smoke for open air-handling spaces; riser cables (CMR, CATVR, BMR, BLR) must stop fire from spreading floor to floor in vertical shafts.

Q27 NEC 800.179(A)

A communications cable will be installed in a duct used for environmental air. Which listing requirement applies per 800.179(A)?

  1. A Listed as fire-resistant and low-smoke-producing, suitable for ducts and plenums
  2. B No special listing needed if the cable is already CMR-rated
  3. C Listed as riser-rated since ducts count as vertical shafts
  4. D Listed only for vertical shaft use with floor-to-floor fire resistance
Show answer & explanation

Correct: A — Listed as fire-resistant and low-smoke-producing, suitable for ducts and plenums

Per 800.179(A), cable in ducts, plenums, and other environmental air spaces (Type CMP, CATVP, BLP) must be listed as suitable for those spaces with fire-resistant and low-smoke-producing characteristics. Riser listing under 800.179(B) addresses vertical shafts, not air-handling spaces, and a CMR rating alone does not satisfy the plenum requirement.

Loomi · NEC exam prep

2,035 questions free on the web. 12,934 in the app.

Loomi's full journeyman bank is timed, NEC-referenced, and runs on spaced repetition that hammers what you miss. Try everything free for 3 days.

Get launch access