A free NEC Article 708 practice test for the journeyman exam: 18 questions on Critical Operations Power Systems (COPS), each with the answer and the why behind it.

18 questions · free · answers included NEC 2023 · Updated

How to use this practice test

These 18 journeyman-exam practice questions cover NEC Article 708 across 18 code concepts, every one with the correct answer and a plain-English explanation of the rule behind it. They come from the same question bank the Loomi app trains you on — this is the free web sample, not a separate watered-down set.

Work straight down the sheet and answer before you peek: each question hides its answer behind Show answer & explanation. Questions tagged Code lookup are speed drills — race your codebook to the cited section. Printing this page gives you a clean paper worksheet with the answers left off.

Generator set requirements for COPS (starting, fuel, disconnects)

NEC 708.20(F)

A generator serving a COPS must self-start on utility failure, hold a 15-minute retransfer delay, and keep every support system it depends on — fuel pumps, dampers, battery chargers — on the COPS itself.

Q1 NEC 708.20(F)

A COPS generator set automatically starts after the normal power source fails. What time-delay requirement applies before it retransfers back to normal power?

  1. A A 30-second delay matching typical emergency system requirements
  2. B A minimum 15-minute setting to avoid retransfer on short-time reestablishment of the source
  3. C No delay is required as long as starting is automatic
  4. D A maximum 5-minute setting to restore normal power as quickly as possible
Show answer & explanation

Correct: B — A minimum 15-minute setting to avoid retransfer on short-time reestablishment of the source

708.20(F)(1) requires a time-delay feature permitting a minimum 15-minute setting before retransfer, so a brief blip in the normal source doesn't cause nuisance transfers back and forth. There's no provision allowing zero delay, a 5-minute cap, or the shorter emergency-system-style delay used elsewhere in the Code.

Maintaining coordination through replacements and modifications

NEC 708.54(B)

Selective coordination isn't a one-time check — any OCPD replacement or system change on a critical operations power system triggers a mandatory reevaluation.

Q2 NEC 708.54(B)

A facility replaces an OCPD in its critical operations power system with a unit of a different trip rating. Per 708.54(B), what must the installer do?

  1. A Reevaluate coordination only with the immediately adjacent downstream OCPD
  2. B Nothing, as long as the new OCPD has an equal or higher ampere rating
  3. C Notify the authority having jurisdiction but no reevaluation is required
  4. D Reevaluate selective coordination with all supply-side and load-side OCPDs
Show answer & explanation

Correct: D — Reevaluate selective coordination with all supply-side and load-side OCPDs

708.54(B) requires that when critical operations power system OCPDs are replaced, they be reevaluated to ensure selective coordination is maintained with ALL supply-side and load-side OCPDs, not just the ampere rating or the nearest device.

GFP testing and selectivity requirements

NEC 708.52(D)

New ground-fault protection must be tested for operation at install, and service/feeder GFP must be fully selective so only the feeder device trips on a downstream fault.

Q3 NEC 708.52(D)

For a critical operations power system, what is the required degree of selectivity between service and feeder ground-fault protection under 708.52(D)?

  1. A Zone-selective interlocking is optional if breakers are the same manufacturer
  2. B Fully selective, 100 percent
  3. C Selective for short circuits only, not ground faults
  4. D 80 percent selective, matching the branch-circuit loading rule
Show answer & explanation

Correct: B — Fully selective, 100 percent

708.52(D) requires ground-fault protection for the service and feeder disconnecting means to be fully selective, achieving 100 percent selectivity so the feeder device opens without the service device opening. There is no 80 percent threshold here (that rule applies elsewhere, to branch-circuit loading, not GFP selectivity), and the section does not carve out an exception for short-circuit-only coordination or same-manufacturer breakers.

Selective coordination of critical operations OCPDs

NEC 708.54

Every OCPD in a critical operations power system must selectively coordinate with all supply-side and load-side OCPDs, as documented by a licensed engineer.

Q4 NEC 708.54 Code lookup

A hospital's critical operations power system (COPS) is being designed. The engineer of record must ensure that COPS overcurrent devices are selectively coordinated with all supply-side and load-side OCPDs, and must document who selected the coordination study and make it available to those who inspect and maintain the system. Which section requires this general selective coordination and documentation obligation?

  1. A 708.24(F)
  2. B 708.54(A)
  3. C 708.54(B)
  4. D 708.52(D)
Show answer & explanation

Correct: B — 708.54(A)

708.54(A) is the General provision requiring COPS OCPDs to be selectively coordinated with supply-side and load-side devices, with documentation available to authorized personnel. 708.52(D) (Selectivity) instead addresses ground-fault protection selectivity, not overcurrent selective coordination generally, and 708.24(F) covers transfer equipment documentation, not OCPD coordination.

COPS branch circuit wiring rules inside vs. outside the DCOA

NEC 708.10(D)

A COPS branch circuit's required protection depends on location: outside the DCOA it needs 708.10(C)(1)-(C)(3) physical and fire protection; inside the DCOA, any Chapter 3 wiring method is fine.

Q5 NEC 708.10(D) Code lookup

A commissioning officer power system (COPS) has branch circuit conductors run inside the designated critical operations area (DCOA) to supply equipment within that same room. Which section specifies which wiring methods are permitted for this run?

  1. A 708.10(C)
  2. B 708.10(D)
  3. C 708.10(B)
  4. D 708.11(A)
Show answer & explanation

Correct: B — 708.10(D)

708.10(D) governs COPS branch circuit wiring and its subpart on 'Within the DCOA' permits any Chapter 3 wiring method for that portion of the run. 708.10(C) is titled 'COPS Feeder Wiring Requirements' — it covers feeders, not branch circuits, so it doesn't apply to this branch-circuit scenario.

Cybersecurity requirements for networked COPS control

NEC 708.7

Networked control of a COPS is only allowed if the system is cybersecurity-evaluated or assessed, with reassessment every 5 years or after any configuration change.

Q6 NEC 708.7

A COPS control interface is connected to a communication network. Per 708.7, what must be true for this to be compliant?

  1. A The network must be physically isolated on its own dedicated circuit
  2. B The manufacturer must hold a UL 508A panel listing
  3. C The network connection must be encrypted with AES-256
  4. D The system must be evaluated for cybersecurity or have a cybersecurity assessment conducted
Show answer & explanation

Correct: D — The system must be evaluated for cybersecurity or have a cybersecurity assessment conducted

708.7 requires a networked COPS control interface to either be identified as evaluated for cybersecurity or have a cybersecurity assessment conducted for vulnerabilities. Encryption specifics, dedicated circuits, and UL 508A panel listing are not the compliance mechanism this section establishes.

Where COPS branch circuit and feeder distribution equipment must be located

NEC 708.11(B)

COPS branch circuit distribution equipment must stay inside the DCOA it serves, while COPS feeder distribution equipment needs a 2-hour fire-rated space above the 100-year floodplain.

Q7 NEC 708.11(B) Code lookup

A COPS (COPS = critical operations power systems) installation includes transfer switches, transformers, and panelboards feeding the feeder circuits. Which section specifies the fire-resistance rating and floodplain-elevation requirements for the room housing this feeder distribution equipment?

  1. A 708.10(C)(2)
  2. B 708.11(A)
  3. C 708.11(B)
  4. D 708.10(C)(3)
Show answer & explanation

Correct: C — 708.11(B)

708.11(B) covers feeder distribution equipment itself (transfer equipment, transformers, panelboards) and requires 2-hour fire-rated spaces above the 100-year floodplain. 708.10(C)(2) and 708.10(C)(3) address protection of the feeder wiring/conductors, not the location of the distribution equipment.

Minimum 72-hour duration requirement for COPS

NEC 708.22(C)

A COPS alternate power source must run the designated critical operations area at full load for at least 72 hours with voltage held within ±10% of nominal.

Q8 NEC 708.22(C)

Under 708.22(C), for how long must the alternate power source be capable of operating a Critical Operations Power System at full DCOA load?

  1. A 48 hours
  2. B 72 hours
  3. C 96 hours
  4. D 24 hours
Show answer & explanation

Correct: B — 72 hours

708.22(C) requires the alternate source to operate the COPS at full load of the designated critical operations area for a minimum of 72 hours. The 24-hour and 48-hour options are shorter durations sometimes confused with other standby or emergency system rules, and 96 hours overstates the actual code minimum.

Protecting COPS feeder wiring from physical damage and fire

NEC 708.10(C)

COPS feeders need both physical damage protection (RMC, IMC, or MI cable, or concrete-encased alternatives) and a separate 2-hour fire rating — concrete encasement alone can satisfy both.

Q9 NEC 708.10(C)

Which wiring method is permitted for COPS feeder physical protection WITHOUT requiring concrete encasement?

  1. A Rigid metal conduit
  2. B Electrical metallic tubing (EMT)
  3. C Schedule 40 rigid PVC conduit
  4. D Flexible nonmetallic raceway
Show answer & explanation

Correct: A — Rigid metal conduit

708.10(C)(1) permits rigid metal conduit, intermediate metal conduit, and Type MI cable as stand-alone physical protection. EMT, Schedule 40 PVC, and flexible nonmetallic raceways are only permitted when encased in not less than 2 in. of concrete.

Selective load management and peak load shaving

NEC 708.22(B)

A COPS alternate source can serve emergency, legally required standby, and optional loads together only if it has the capacity, or if automatic load shedding always protects them in strict priority order.

Q10 NEC 708.22(B)

Under 708.22(B), when a COPS alternate power source doesn't have enough capacity to run all connected loads at once, which circuits must load management restore or protect first?

  1. A Legally required standby circuits
  2. B Optional standby circuits
  3. C COPS and emergency circuits
  4. D Whichever circuits were energized first
Show answer & explanation

Correct: C — COPS and emergency circuits

708.22(B) sets a strict priority: COPS and emergency circuits first, legally required standby circuits second, and optional standby circuits last. The legally required standby and optional standby circuits are lower priority, not first.

Marking and identifying COPS boxes and receptacles

NEC 708.10(A)

Every COPS box, enclosure, and receptacle must be permanently and visibly marked so it's never confused with a normal power system.

Q11 NEC 708.10(A) Code lookup

A hospital's electrical room contains a critical operations power system (COPS) transfer switch alongside normal-power equipment. Which section requires the transfer switch enclosure to be permanently marked as part of the COPS?

  1. A 708.5
  2. B 708.10(A)(1)
  3. C 708.11(A)
  4. D 708.10(A)(2)
Show answer & explanation

Correct: B — 708.10(A)(1)

708.10(A)(1) specifically requires boxes and enclosures for COPS circuits — including transfer switches, generators, and power panels — to be permanently marked when other power systems are also present in the building. 708.11(A) instead addresses branch circuit distribution equipment location/access, not marking, and 708.5 covers physical security, not identification.

Physical security and restricted access for COPS equipment

NEC 708.5

COPS physical security must flow from a documented risk assessment, and COPS circuits and equipment must be accessible to qualified personnel only.

Q12 NEC 708.5

Per 708.5(A), what must the physical security strategy for a critical operations power system be based on?

  1. A The results of a risk assessment
  2. B A perimeter fence around the entire facility
  3. C A written policy created only after a security incident occurs
  4. D A UL-listed intrusion alarm installed on every COPS panel
Show answer & explanation

Correct: A — The results of a risk assessment

708.5(A) requires the security strategy to be developed, documented, and implemented based on the results of a risk assessment. Specific hardware like alarms or fencing isn't mandated by this section, and the assessment must happen up front, not reactively after an incident.

Risk assessment process for critical operations power systems

NEC 708.4

COPS risk assessment is a documented three-step process: assess hazards and vulnerability, identify hazard categories, then build a mitigation strategy for gaps the Code doesn't already cover.

Q13 NEC 708.4

Per 708.4, what is required of the risk assessment for a critical operations power system?

  1. A It must be documented and conducted per the process in 708.4(A) through (C)
  2. B It must be performed only by a licensed structural engineer
  3. C It must be submitted to the authority having jurisdiction for pre-approval before design begins
  4. D It must be updated only after an actual outage event occurs
Show answer & explanation

Correct: A — It must be documented and conducted per the process in 708.4(A) through (C)

708.4 requires the risk assessment to be documented and conducted in accordance with 708.4(A) through (C). The Code does not mandate AHJ pre-approval of the assessment itself, does not restrict who performs it to a structural engineer, and does not limit assessment timing to after an outage — those are plausible-sounding but unsupported requirements.

Wiring requirements for HVAC, fire alarm, security, and signaling systems on COPS

NEC 708.14

COPS life-safety and signaling cables need metal wiring methods plus 2-hour fire-resistive protection — this isn't ordinary low-voltage wiring.

Q14 NEC 708.14

Under 708.14, what level of fire protection must fire alarm, security, emergency communications, and signaling cables on a COPS installation have?

  1. A Riser-rated cable only, with no additional fire-resistive protection required
  2. B Plenum-rated cable in lieu of a listed fire-resistive system
  3. C Part of a listed 2-hour fire-resistive cable system or protected by a listed 2-hour electrical circuit protective system
  4. D Part of a listed 1-hour fire-resistive cable system, matching standard emergency system wiring
Show answer & explanation

Correct: C — Part of a listed 2-hour fire-resistive cable system or protected by a listed 2-hour electrical circuit protective system

708.14(7) requires these cables to be riser-rated AND part of a listed 2-hour fire-resistive cable system or protected by a listed 2-hour electrical circuit protective system. Riser-rating alone is not sufficient, and 1-hour or plenum-only ratings do not meet the 2-hour requirement in 708.14.

Periodic testing, maintenance, and load testing for COPS

NEC 708.6

COPS must be tested at installation and on an AHJ-approved schedule after, with documented maintenance and a way to test under full load.

Q15 NEC 708.6 Code lookup

A hospital's critical operations power system is being commissioned, and the AHJ wants documentation showing the on-site generator and transfer switches were tested while carrying the facility's maximum anticipated critical load, not just a no-load functional check. Which section requires this full-load testing capability?

  1. A 708.6(C)
  2. B 708.6(E)
  3. C 708.6(A)
  4. D 708.8(D)
Show answer & explanation

Correct: B — 708.6(E)

708.6(E) specifically requires means for testing critical power systems under maximum anticipated load conditions. 708.8(D) covers functional performance tests during initial commissioning, not the recurring means for full-load testing, and 708.6(A)/708.6(C) address AHJ witnessing and preventive maintenance programs rather than load testing capability.

Ground-fault protection scope and required feeder step in critical operations power systems

NEC 708.52(B)

In a critical operations power system, if ground-fault protection exists at the service or feeder disconnect, the next feeder disconnect downstream must add one more step of it.

Q16 NEC 708.52(B)

A critical operations power system has ground-fault protection on its feeder disconnecting means under 215.10. What does 708.52(B) additionally require?

  1. A A second, separate feeder disconnecting means with its own transfer switch
  2. B The existing GFP must be relocated downstream instead of staying at that feeder
  3. C An additional step of ground-fault protection at the next feeder disconnecting means downstream toward the load
  4. D Nothing further — one level of GFP satisfies a COPS
Show answer & explanation

Correct: C — An additional step of ground-fault protection at the next feeder disconnecting means downstream toward the load

708.52(B) requires that once GFP is provided per 230.95 or 215.10, an additional step of ground-fault protection be added at the next level feeder disconnecting means downstream toward the load — the upstream protection isn't relocated or considered sufficient alone.

Automatic transfer switch requirements

NEC 708.24(C)

When switching between non-synchronized sources, an automatic transfer switch must be listed for emergency use and be electrically operated, mechanically held.

Q17 NEC 708.24(C) Code lookup

A facility has a generator and utility service that are not inherently synchronized with each other, so the automatic transfer switch must sequence the transfer without paralleling the sources. Which section specifies the operational and listing requirements for this type of automatic transfer switch?

  1. A 708.22(A)
  2. B 708.24(D)
  3. C 708.24(B)
  4. D 708.24(C)
Show answer & explanation

Correct: D — 708.24(C)

708.24(C) governs automatic transfer switches used with non-synchronized sources, requiring them to be listed for emergency use and to be electrically operated, mechanically held. 708.24(B) instead covers bypass isolation switches, a different transfer switch configuration, and 708.24(D) covers redundant transfer equipment, not the basic listing/operation requirement.

Storage battery sources for COPS

NEC 708.20(E)

A COPS storage battery needs an automatic charger matched to it, and automotive batteries are never allowed.

Q18 NEC 708.20(E)

Under 708.20(E), which requirement applies to a storage battery used as a source for a critical operations power system (COPS)?

  1. A The battery may be charged by any means as long as it is inspected annually
  2. B A manual charging switch shall be provided so operators control charge timing
  3. C An automatic battery charging means shall be provided
  4. D Any deep-cycle automotive battery rated for continuous duty is permitted
Show answer & explanation

Correct: C — An automatic battery charging means shall be provided

708.20(E) requires an automatic battery charging means — manual-only charging or ad hoc inspection schedules don't satisfy this. It also explicitly bars automotive-type batteries, so the deep-cycle automotive option is wrong regardless of duty rating.

Loomi · NEC exam prep